Rashtreeya Vidyalaya Road metro station
Namma Metro's Green & Yellow Line interchange station / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Rashtreeya Vidyalaya Road metro station?
Summarize this article for a 10 year old
Rashtreeya Vidyalaya Road is an elevated interchange metro station on the North-South corridor of the Green Line and the East-West corridor of the upcoming Yellow Line of Namma Metro serving the 5th and 8th Block of Jayanagar area of Bangalore, India. It was opened to the public on 18 June 2017.[1]
Rashtreeya Vidyalaya Road | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Namma Metro station | ||||||||||||||||
General information | ||||||||||||||||
Other names | R. V. Road, Rashtreeya Vidyalaya Raste, R. V. Raste, Jayanagara 5th Block, Jayanagar 5th Block | |||||||||||||||
Location | Rashtreeya Vidyalaya Road, 5th Block, Jayanagar, Bengaluru, Karnataka 560041 | |||||||||||||||
Coordinates | 12.921458°N 77.580375°E / 12.921458; 77.580375 | |||||||||||||||
Owned by | Bangalore Metro Rail Corporation Ltd (BMRCL) | |||||||||||||||
Operated by | Namma Metro | |||||||||||||||
Line(s) | Green Line Yellow Line | |||||||||||||||
Platforms | Side platform Platform-1 → Nagasandra Platform-3 → Train terminates here Platform-4 → Bommasandra Platform numbers (TBC) | |||||||||||||||
Tracks | 2 | |||||||||||||||
Connections | Upcoming Yellow Line | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated, Double track | |||||||||||||||
Platform levels | 2 | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Status | Staffed | |||||||||||||||
Station code | RVR | |||||||||||||||
History | ||||||||||||||||
Opened | 18 June 2017; 6 years ago (2017-06-18) | |||||||||||||||
Opening | November 2024; 5 months' time (November 2024) (TBC) | |||||||||||||||
Electrified | 750 V DC third rail | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
|
As per latest reports, the Yellow Line is stated to be operational around November 2024 due to the upcoming Indian general election which will occur during April–May 2024 and lots of trial runs along with more trainsets are required for commencement of operations.[2][3][4][5][6]