Linha de Vendas Novas is a freight railway line which connects the stations of Setil, on the Linha do Norte, and Vendas Novas, on the Linha do Alentejo, in Portugal. It was opened on 15 January 1904.[1] This line also previously had a regional passenger service which operated until 2005, then again between 2009 and 2011. Passenger service on this line was discontinued due to low ridership.
Quick Facts Overview, Status ...
Linha de Vendas Novas |
---|
Agolada railway station |
|
Status | Operational |
---|
Termini | |
---|
|
Line length | 69.6 km (43.2 mi) |
---|
Track gauge | 1,668 mm (5 ft 5+21⁄32 in) Iberian gauge |
---|
Route map |
---|
|
|
|
|
00 0 |
L. Norte → Lisboa-S. A. |
|
|
|
56,400 |
Setil |
|
|
|
0,500 |
(1) C. Norte Setil |
|
|
|
|
L. Norte |
|
|
|
|
Setil Bridge × V. R. de Azambuja |
|
|
|
03,428 |
Morgado |
|
|
|
00 0 |
(antigo traçado) |
|
|
|
|
(2) Rainha D. Amélia Bridge × N3-3 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(old route) |
|
|
|
|
|
|
|
|
|
× V. de Muge |
|
|
|
|
|
|
|
|
|
L. Chamusca → Golegã (canc. proj.) |
|
|
|
06,647 |
Muge |
|
|
|
|
× EN118 |
|
|
|
11,900 |
Marinhais |
|
|
|
|
× A13 |
|
|
|
19,518 |
Desvio PK 19,5 |
|
|
|
|
Fajarda (proj. abd.) |
|
|
|
|
Agolada Bridge × V. R. da Agolada |
|
|
|
27,150 |
Agolada (closed) |
|
|
|
|
× EN114-3 |
|
|
|
31,602 |
Coruche |
|
|
|
|
× R. Coruche |
|
|
|
|
R. Avis |
|
|
|
|
× EN251 |
|
|
|
|
L. Sorraia → Ponte de Sor (canc. proj.) |
|
|
|
34,096 |
Quinta Grande (closed) |
|
|
|
|
L. Sorraia |
|
|
|
|
× C. do Sorraia |
|
|
|
36,613 |
Quinta Grande-DAI |
|
|
|
39,840 |
Salgueirinha (closed) |
|
|
|
45,804 |
São Torcato (closed) |
|
|
|
50,950 |
Lavre |
|
|
|
|
Lavre Bridge × Lavre River |
|
|
|
57,630 |
Canha (closed) |
|
|
|
|
Vale de Boi Bridge × Almansor R. |
|
|
|
61,000 |
Vale de Boi (dem.) |
|
|
|
65,230 |
Vidigal (closed) |
|
|
|
00 0 |
L. Alentejo → Barreiro |
|
|
|
|
C. Bombel |
|
|
|
69,4 |
Vendas Novas |
|
|
|
|
Alcácer do Sal (cancelled proj.) |
|
|
|
00 0 |
L. Alentejo → Funcheira |
|
|
|
|
|
|
|
|
|
|
|
Close