Jurong Region MRT line
Mass Rapid Transit line in Singapore / From Wikipedia, the free encyclopedia
The Jurong Region Line (JRL) is a Mass Rapid Transit line opening in 2026 that is in the western part of Singapore.[1][2] It reaches north to Choa Chu Kang, south to Jurong Pier, west to Peng Kang Hill and east to Pandan Reservoir. The line will be the seventh MRT line to be built.
Quick Facts Overview, Native name ...
Jurong Region Line | |
---|---|
Overview | |
Native name | Laluan Daerah Jurong 裕廊区域线 ஜூரோங் வட்டாரப் பாதை |
Status | Planned |
Owner | Land Transport Authority |
Termini | Choa Chu Kang Jurong Pier Pandan Reservoir Peng Kang Hill |
Stations | 24 |
Service | |
Type | Rapid transit/Light metro |
System | Mass Rapid Transit (Singapore) |
Services | 3 |
Operator(s) | TBA |
Depot(s) | Tengah |
Rolling stock | CJ151 |
History | |
Planned opening | 2026 (Stage 1) 2027 (Stage 2) 2028 (Stage 3) |
Technical | |
Line length | 24 km (15 mi) |
Character | Above ground |
Track gauge | 1,435 mm (4 ft 8 1⁄2 in) |
Close
The JRL is the third MRT line in Singapore to be constructed with tracks that are above ground, after the East West Line and the North South Line, and the first MRT line to be built fully above ground, with no parts that are underground or at the ground level.
The line is colored turquoise on the MRT Rail map.